Skip to content
TLC Group

Comprehensive system of aircraft maintenance platforms 

Projects

TLC Group
24.11.2025

Comprehensive system of aircraft maintenance platforms 

For one of Europe’s leading aircraft manufacturers, TLC developed a set of three service platforms designed directly on the basis of the client’s technical documentation and adapted to the specific requirements of aircraft maintenance operations.
TLC Group
27.03.2025

Spiral stairs for PGNiG Termika – Pniówek Plant

As part of the “Construction of a dry desulfurization installation (1100 mg/m³u) for boilers K1, K2, K3” project carried out by PGNiG TERMIKA Energetyka Przemysłowa S.
TLC Group
17.02.2025

New gas sphere in Papeete – TLC supports a key energy investment

A new gas sphere is under construction in Papeete, aiming to increase gas storage capacity by 50% in 2025.
TLC Group
27.01.2025

Hungary 2025

Number of tanks: 1 Diameter: 16 m / 52,49 ft ft Height: 17 m / 55,77 ft Weight: 120 t / 264555 lbs. Capacity: 3000 m³ / 792516 gal.
TLC Group
09.10.2024

Austria 2024

Number of tanks: 1 Diameter: 9.5 m / 31.16 ft ft Height: 12 m / 39,37 ft Weight: 33 t / 72752 lbs. Capacity: 800 m³ / 211338 gal.
TLC Group
05.10.2024

Modular container stairs for construction sites in Germany

TLC container stairs went to the town of Balingen in Germany.